Based on learnings from TCCT’s extensive development history and incorporating technological advancements in hazardous waste processing and emission control, EnviroMaster has developed engineering designs and concept planning for a state-of-the-art, purpose built, commercial scale TCCT asbestos waste processing facility – the first of its kind in the world.

Designed to process a minimum of 100 tonnes of asbestos waste per day, EnviroMaster’s design provides a controlled, integrated facility to receive and process waste, creating a safe working environment for transport staff and facility employees, as well ensuring the safety of surrounding communities. Featuring a main plant, unloading/loading storage sheds, secondary sheds, administration building, and ancillary areas, the entire waste handling system is fully enclosed and maintained at negative pressure to maximise plant and employee health and safety.

EnviroMaster’s work to date provides detailed analysis and mapping from administrative controls through to waste processing and pollution abatement.

Based on EnviroMaster’s system, asbestos is efficiently destructed within 20 minutes of processing, resulting in an inert, non-hazardous end treated product that can be used in a variety of non-structural construction applications.

A fly through of EnviroMaster’s Concept Facility can be viewed here.

In addition, please download our Concept Facility Process Map.